Late summer is the right time to seal Camas concrete patios. The dry window between July and September gives sealer time to cure before fall rain returns.
Concrete curing in the humid Columbia River corridor takes longer than the bag suggests. Air entrainment and proper finishing matter most in Camas climates.
Vapor barriers under Camas concrete slabs are required for any heated or finished space. Clark County moisture moves up through soil and damages flooring.
Air-entrained concrete is the right mix for Camas. The tiny air pockets absorb freeze-thaw expansion and stop the surface scaling we see across Clark County.